New South Mussafah Channel, Abu Dhabi
 
Scope of Works : Dredging 3.5 km Channel to – 6.00 ACD & Backfill Low Areas to + 5.3 ACD
Client                 : Abu Dhabi Municipality
Consultant         : Halcrow International Partnership
Contract            : AED 113,601,500/-
Quantity            : 16,000,000 m³
Area                  : 11 kms² Approximately
Type of Soil      : Sand, Sand Stone & Silt Stone
Date of Start    : October 2001
Completion       : April 2004
Period              : 31 months
 
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
 
GASCO Pipeline Corridor
 
Scope of Works : Backfilling in the Gasco Pipeline Corridor up to ± 5.0m ACD
Client                 : Abu Dhabi Municipality
Consultant         : Halcrow International Partnership
Contract            : AED 19,060,500/-
Quantity            : 1,650,000 m³
Area                  : 6.75 km Approximately x 150 m’ Wide
Type of Soil      : Fine Quality Sand & Gatch
Date of Start     : December 2003
Completion       : April 2004
Period               : 5 months
 
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
   
Backfilling for ADWEA
 
Scope of Works : Construction of Earthwork Foundation & Plat- form for Electric Towers
Client                 : KEC International Limited
Area                  : 6.7 km Approximately
Contract            : AED 270,000/-
Date of Start     : March 2002
Completion       : May 2002
Period               : 3 months
   
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Reclamation Works in Area Block B3
 
Scope of Works : Reclamation & Filling of Area for Construction of Pumping Station & Storage Water Tanks
Client                 : Abu Dhabi Water and Electricity Authority
Quantity            : 60,000 m³
Area                  : 40,000 m²
Value                 : AED 472,548/-
Date of Start     : June 2002
Completion       : August 2002
Period               : 3 months
   
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------
   
Delma Project
 

HAFEET DREDGING LLC were invited by the Private Department of H.H.Sheikh Zayed Bin Sultan Al Nahyan to execute a Dredging Project at Delma Island.

The scope of works were to dredge basin size of 120x250 meters to - 5.00m . The total quantity dredged was 150,000m3. Dredged material was to be deposited along the shore line.

The duration of the contract was 1 month.
The contract value was AED 1,400,000/

 
Scope of works    : Dredge basin Size 120x250 meters to -5.00 meter
Client                   : Private Department of H.H. Sheikh Zayed Bin Sultan Al Nahyan
Area                    : 1km
Contract value    : AED 1,400,000/-
Date of start       : June 2004
Completion         : July 2004
Period                 : 1 month
 
 
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Projects Executed at Bahrain
 
Dredging, Reclamation & Shoreline Protection Works for Bander Seef Development, Busayteen & West Hidd Reclamation
 

HAFEET DREDGING LLC were invited by Wade Adams (Bahrain) W.L.L to execute a Dredging & Reclamation Project for the Ministry of Housing at Kingdom of Bahrain .

The scope of works were to dredge hard material to create two channels in Busayteen & West Hidd of 100 x 6 kilometers. The total quantity dredged was 2,500,000m3. Dredged material was to be deposited along the shore line.

The duration of the contract was 9 months.
The contract value was AED 20,110,000/-

Scope of works      : Dredge Channels, Static Pumping- 2,500,000m3 Size 100x6 kilometers.
Client                     : Wade Adams (Bahrain) W.L.L (for Ministry of Housing, Kingdom of Bahrain)
Consultants           : Ansari Engineering Consultants
Area                      : 6km
Contract value      : AED 20,110,000/-
Date of start         : April 2005
Completion           : December 2005
 
 
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
 
Worked as a booster for Boskalis Project in Juffair Club dredging & reclamation works in Bahrain.
 
HAFEET DREDGING LLC were chartered by Boskalis Westminster Middle East in Bahrain for a project for the Ministry of Housing at Kingdom of Bahrain near the Sheikh Khalifa Bridge in North Juffair.
The scope of works was to pump the dredge materials received from ‘HSD Coastway’ to a distance of 3 kms.
The duration of the contract was 5 months.
Contract value       : AED 3,500,000/-
Date of start          : March 2006
Completion            : June 2006
 
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Vessel Dry Docking in ASRY - Kingdom of Bahrain - 2006
 
Hafeet Dry docked in July 2006. The hull, up to the deck level was completely blasted and painted, and on completion, Hafeet was then fully inspected by Germanischer Llyod to maintain vessel in class.
 
 
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Vision Development WLL Project Asry Basin Bahrain 2006 - 2007
 
Hafeet Dredging LLC entered a contract with Vision Development WLL for dredging Asry Basin for stockpile and for Asry Slipway. Work commenced in December 2006 and is going in September 2007. Dredging volume is 4,000,000 m3 plus.
 
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
TECHNICAL DATA OF CSD ‘HAFEET’
 
Built                            IHC Sliedrecht Beaver 8000
Year of Construction 1984
Classification B.V I 3/3 (-) Dredger NP Deep sea
Tonnage GT 1259 / NT 375
Length overall 77.50 m
Length hull 61.00 m
Width 17.00 m
Moulded Depth 4.25 m
Maximum Draught 3.00 m
Suction pipe diameter 750 mm
Maximum dredging depth 22.00 m
Minimum dredging depth 4.5 m
Anchoring system Spud carriage / Anchor Booms
Total Installed power 7965 HP - 5939 kw
Cutter output 1200 HP - 894 kw
Suction pump output 1000 HP -754 kw
Discharge pump output 2 x 2280 HP - 3400 kw
 
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
 
List of Machines & Equipment for our Dredging Operations.
 
Category Nos.
IHC Beaver 8000 01
Floating Pipeline 800m
Floating Pipeline Pontoons 65
Land Pipeline 3 kms
Henk 500mm Pump 01
Generators 02
Tugs 02
Speedboat 01
Pickup 01
Bus 01
H.D. 4 Wheel Drive 06
Cars 11